From the early pioneers on the Snowy Mountains Hydroelectric Scheme, to our leaders and innovators of today, our people make us who we are.
Through our network of global specialists and by collaborating with local partners, we connect you with the best teams and capabilities to deliver highly innovative and sustainable solutions.
As an organisation we are continually evaluating ways we can better provide a safe, flexible, inclusive and respectful workplace for our people and clients.
People are at the heart of our organisation, we strive to create a flexible, diverse and inclusive environment that enables our people to thrive to their fullest potential.
Explore career opportunitiesSouth Africa
The Project Team was awarded first place in the Bridges Category and was selected as the Overall Winner for the Steel Awards – a coveted win for the team, considering the awards adjudication panel received over 45 entries across nine categories.
The Structures team was engaged by V&A Waterfront Holdings (Pty) Ltd as the lead design firm and structural engineers, working in conjunction with COA Architects and Eadon Consulting, for the replacement of a 22-year-old swing footbridge.
The smaller swing bridge, built in 1997, was a beautiful and materially efficient structure that impressively opened and closed up to 60 times a day. However, with the further expansion of the Waterfront, the number of people crossing the cut was increasing yearly. The previous 2m wide walkway, which once seemed appropriate, was by 2016 carrying 2.4 million people per year. To keep pace with the demand, a new, wider bridge was commissioned.
The team provided innovative design solutions to a number of technical challenges. Read more in our media release.
Hydropower investigation, Sierra LeoneHydropower investigation, Sierra Leone