From the early pioneers on the Snowy Mountains Hydroelectric Scheme, to our leaders and innovators of today, our people make us who we are.
Through our network of global specialists and by collaborating with local partners, we connect you with the best teams and capabilities to deliver highly innovative and sustainable solutions.
As an organisation we are continually evaluating ways we can better provide a safe, flexible, inclusive and respectful workplace for our people and clients.
People are at the heart of our organisation, we strive to create a flexible, diverse and inclusive environment that enables our people to thrive to their fullest potential.
Explore career opportunitiesGhana
Located on the Black Volta River, the existing Bui Generating Station produces 404 MW but operating supply is affected by the dry season. Spanning six sites in Northern Ghana, Bui Power Authority aims to generate and supply an additional 200MW of solar power into Ghana’s main energy grid. The sites identified for investigation include Bawku, Yendi, Tumu, Sawla, Buipe and Zebilla.
SMEC (engineering partner) and Sienna Services (main contractor) recently commenced feasibility studies, working with the client and stakeholders to develop a hydro-solar hybrid power supply framework. SMEC’s nominated team brings extensive experience in complex Power System Studies.
It is envisaged that the new solar plants will be linked into existing substations (owned Ghana’s national grid managers GRIDCo) for power evacuation. Impact assessment studies will determine the capacity of each substation and any upgrade works that may be required. For the development of solar PV projects bigger than 20MW on High Voltage transmission lines, the regulatory authority in Ghana also requires the addition of a backup (storage) system.
To determine the suitability of each site, a comprehensive assessment of existing transmission lines, substations and associated infrastructure will be undertaken. SMEC will also assess solar generation capacity, taking into consideration the acreage, amount of sunlight hours and efficiency of solar PV equipment.
It is anticipated that solar plants ranging between 10MWp-100MWp can be integrated into the National Interconnected Transmission System (NITS). Rigorous grid impact modelling and scenario modelling will be undertaken along with simulation of existing solar infrastructure at Bui to analyse the impact of the increased power injection.
Aerial view of the Bui Generating Station commissioned 2013
SMEC has operated in Ghana since 1976, and established a permanent office in Accra in 1998. SMEC’s first project in Ghana was a feasibility study and detailed design services for the Bui Hydroelectric Power Project.
Summary of scope: