The TSE Project used five tunnel boring machines to deliver 15.5-kilometre twin railway tunnels from the end of Sydney Metro Northwest at Chatswood, beneath Sydney Harbour and the CBD to Sydenham in Sydney’s inner west. The TSE contract also delivered excavations and tunnels for new metro stations at Crows Nest, North Sydney, Barangaroo, Martin Place, Pitt Street and Waterloo, and civil works for a new stabling facility at Marrickville.
Congratulations to the Sydney Metro project delivery team and the D&C contractor, a Joint Venture of John Holland, CPB Contractors and Ghella.
Image ‘Artist Impression of Sydney Metro TBM Sydney Harbour’ Source: https://www.sydneymetro.info/gallery
SMEC to investigate Hydropower to balance Sierra Leone energy deficitSMEC to investigate Hydropower to balance Sierra Leone energy deficit
Showcasing technical excellence at Madrid Footbridge Conference 2022Showcasing technical excellence at Madrid Footbridge Conference 2022
SMEC to lead major infrastructure development at Port Lae Tidal Basin (Phase 2)SMEC to lead major infrastructure development at Port Lae Tidal Basin (Phase 2)
Climate and Disaster Resilient Irrigation and Drainage set to reshape lives of farmers in TajikistanClimate and Disaster Resilient Irrigation and Drainage set to reshape lives of farmers in Tajikistan